TOPIC: Durability

Red medical kit in life preserver

Los acoples de HDPE rescatan las soldaduras por fusión fallidas de un vertedero

Gas is extracted with vertical wells & vacuum system then transported to gas-to-energy plant via HDPE pipe before being converted into power.

3D Render - Server racks in server room data center

The 3 Top Data Center Construction Trends

Looking at 2019 Construction Trends in Data Centers, we highlight the top 3: Prefabrication, BIM-enabled technology and Density Diversity.

Montreal, Canada repairs a 20-inch buried HDPE piping system that carries wastewater to the municipal sewage system with Victaulic couplings 2017

Can I use Victaulic in my Buried Pipe Design?

Learn more about how Victaulic couplings reduce labor & risk, and ensure confidence in buried pipe design.

Fire protection system installer working with a Victaulic roll grooving pipe tool

Switch Pipe Joining Method to Increase Corrosion Resistance

Increasing the schedule of the pipe in a fire protection system to increase corrosion resistance is a common practice, but can make the cost of mat...

Extremos ranurados Victaulic en válvula de control hidráulico BERMAD (WB-12672-RevA)

Victaulic Grooved Ends on BERMAD Control Valves

Victaulic is partnering with one of the world’s leading manufacturers of advanced control valve solutions to redefine value for our customers.

Victaulic HDPE Mechanical Pipe Joining System Solution mechanical joints designed & tested to withstand pipe movement caused by temperature fluctuations

¿Los productos de Victaulic cómo ayudan al HDPE a superar el calor?

When the Glencore Oaky Creek coal mine was set to install an 8km, large-diameter HDPE raw water pipeline Glencore chose a new pipe joining method.

prueba de resistencia al fuego de conexiones de tuberías

Irons In the Fire: Fire Endurance Testing for Pipe Fittings

Mechanical pipe couplings outperform other pipe joining methods in fire endurance testing because they have a unique advantage over them.

Construction Workers - Shinn Tunnel

Piping Partnership Helps Contractor Finish Project in 10 Weeks

Partnering with Milwaukee & Victaulic, Shinn Mechanical installed, tested & completed a piping system in Seattle SR 99 tunnel in 10 weeks.