Tunnel Under Vistula River

Źródło PRG Metro Sp. z o.o. Hydrobudowa 9 S.A.2
Wastewater Icon

INFORMACIÓN GENERAL DEL PROYECTO

TIPO DE PROYECTO:
Transporte
Propietario:

Miejskiei Kanalizacji w m.st. Warszawa

Ingeniería:

Grontmij Polska Sp. z o .o.

Contratista:

PRG Metro Sp. z o.o., Hydrobudowa 9SA

Material de tuberías:

Acero al carbón

Tamaños de tuberías:

4”-12”

Ubicación:

Warsaw, Poland

Soluciones:

  • Facilidad y rapidez de instalación
  • Time and cost savings
  • Seguridad
  • Confiabilidad

The new 1300 meter long tunnel under the Vistula River is a key element to transmit wastewater from the left bank districts of Warsaw to the Czajka wastewater treatment plant, located on the right side of the river. In the tunnel, with an inner diameter of 4.5 meters, are two routes of pipelines, with a diameter of 1.6 meters each. It would also include the track for a service railway car, ventilation systems, closed-circuit television, and other installations.

Victaulic provided the tunnel construction team with a safe, fast, and reliable construction methodology for the piping systems. In this tunnel, Victaulic’s solutions were utilized on the water, compressed air, and slurry lines.

By installing Victaulic flexible coupling technology,  PRG Metro and Hydrobudowa 9SA were able to accommodate the piping curvature and thermal movement. The simplicity of installation allowed the contractors to dramatically compress the construction schedule while guaranteeing jobsite safety by eliminating hazardous fumes and hot works in a closed environment.

PRG Metro and Hydrobudowa 9SA selection of Victaulic solutions allowed the contractors and owner to reduce total installed cost while guaranteeing the quality, safety, and performance of the system.

DE UN VISTAZO

TIPO DE PROYECTO:
Transporte
Wastewater Icon
Propietario:

Miejskiei Kanalizacji w m.st. Warszawa

Ingeniería:

Grontmij Polska Sp. z o .o.

Material de tuberías:

Acero al carbón

Ubicación:

Warsaw, Poland

Contratista:

PRG Metro Sp. z o.o., Hydrobudowa 9SA

Tamaños de tuberías:

4”-12”

Soluciones:

  • Facilidad y rapidez de instalación
  • Time and cost savings
  • Seguridad
  • Confiabilidad

The new 1300 meter long tunnel under the Vistula River is a key element to transmit wastewater from the left bank districts of Warsaw to the Czajka wastewater treatment plant, located on the right side of the river. In the tunnel, with an inner diameter of 4.5 meters, are two routes of pipelines, with a diameter of 1.6 meters each. It would also include the track for a service railway car, ventilation systems, closed-circuit television, and other installations.

Victaulic provided the tunnel construction team with a safe, fast, and reliable construction methodology for the piping systems. In this tunnel, Victaulic’s solutions were utilized on the water, compressed air, and slurry lines.

By installing Victaulic flexible coupling technology,  PRG Metro and Hydrobudowa 9SA were able to accommodate the piping curvature and thermal movement. The simplicity of installation allowed the contractors to dramatically compress the construction schedule while guaranteeing jobsite safety by eliminating hazardous fumes and hot works in a closed environment.

PRG Metro and Hydrobudowa 9SA selection of Victaulic solutions allowed the contractors and owner to reduce total installed cost while guaranteeing the quality, safety, and performance of the system.