La instalación de desalinización – Southern Seawater Authority Perth 2 – se diseñó para apoyar la región metropolitana de Perth en Australia Occidental. La planta se construyó para hacerle frente al aumento en el consumo de agua que se experimentó a raíz de un crecimiento de la población y menos lluvia.
The Southern Sea Water Authority needed to find a solution that would reduce the project schedule on the facility that was being built to support the mandate to produce water for Western Australia. Victaulic’s grooved piping products and solutions were able to reduce the project schedule, labor, and costs on the facility.
Victaulic’s Virtual Design and Construction Team presented to SSWA conversions of welded joints, flanged joints, and valve assemblies to Victaulic grooved piping solutions. The solutions included the StrengThin™ System for high pressure on thin-wall super duplex stainless steel piping. The Victaulic solutions were utilized on the high-pressure reverse osmosis system.
El rápido ensamblaje in situ del sistema StrengThin™ y las válvulas de tapon de alta presión ofrecidas por Victaulic redujeron dramáticamente las horas de trabajo y asistieron en terminar el proyecto a tiempo. La instalación in situ para el ensamblaje completo de una válvula DN400 de 16 pulgadas se redujo de dos días y medio a 10 minutos.
La planta de desalinización Southern Sea Water Authority Perth 2 tiene el potencial de entregar un 30% del suministro de agua del estado de Australia Occidental de fuentes independientes del clima.