Northeast Water Purification Plant Expansion Project – Central Plant

Northeast Water Purification Project Expansion Site
Wastewater Icon

INFORMACIÓN GENERAL DEL PROYECTO

TIPO DE PROYECTO:
Water Treatment Plant
Propietario:

City of Houston

Ingeniería:

Houston Waterworks Team (HWT) (a JV of Jacobs and CDM Smith)

Contratista:

Balfour Beatty, McCarthy Building Companies

Material de tuberías:

Acero al carbón

Tamaños de tuberías:

72” – 120”

Ubicación:

Humble, Texas

Soluciones:

  • Dynamic Movement
  • Asentamiento diferencial
  • Mitigación de riesgos

Due to decades of groundwater extraction, the state of Texas is facing major issues of land subsidence. In efforts to address the land subsidence as well as meet the increased demand for drinking water, the state has developed programs that entail projects to convert from using groundwater to using surface water.

This included three major projects in the greater Houston area. Luce Bayou Interbasin Transfer Project, Northeast Water Purification Plant Expansion Project, and the North Harris West Fort Bend Pipeline Project. These projects are all focused on utilizing water from rivers and lakes around the city of Houston for treatment and distribution.

In these systems, Victaulic has been utilized to provide solutions including dynamic movement, in the form of vibration, expansion, and contraction, and differential settlement.

The Northeast Water Purification Plant Expansion Project specifically focuses on expanding the existing water treatment plant from 50 million gallons of water per day to 400 million gallons of water per day. Victaulic has partnered with the Houston Waterworks Team (HWT) (a JV of Jacobs and CDM Smith) to provide reliable infrastructure piping solutions. Victaulic Dynamic Movement Joints were utilized to accommodate for the expected amount of differential settlement present on site. Additional Victaulic solutions, Style W77 Flexible Couplings, and Victaulic Bolted Split Sleeve Couplings were utilized in other areas of the site to accommodate for dynamic movement.

To learn more about Victaulic’s role at the NEWPP Intake Pump Station, another critical component of the NEWPP Expansion Project, click here.

Enlaces externos

Northeast Water Purification Plant Expansion

DE UN VISTAZO

TIPO DE PROYECTO:
Water Treatment Plant
Wastewater Icon
Propietario:

City of Houston

Ingeniería:

Houston Waterworks Team (HWT) (a JV of Jacobs and CDM Smith)

Material de tuberías:

Acero al carbón

Ubicación:

Humble, Texas

Contratista:

Balfour Beatty, McCarthy Building Companies

Tamaños de tuberías:

72” – 120”

Soluciones:

  • Dynamic Movement
  • Asentamiento diferencial
  • Mitigación de riesgos

Due to decades of groundwater extraction, the state of Texas is facing major issues of land subsidence. In efforts to address the land subsidence as well as meet the increased demand for drinking water, the state has developed programs that entail projects to convert from using groundwater to using surface water.

This included three major projects in the greater Houston area. Luce Bayou Interbasin Transfer Project, Northeast Water Purification Plant Expansion Project, and the North Harris West Fort Bend Pipeline Project. These projects are all focused on utilizing water from rivers and lakes around the city of Houston for treatment and distribution.

In these systems, Victaulic has been utilized to provide solutions including dynamic movement, in the form of vibration, expansion, and contraction, and differential settlement.

The Northeast Water Purification Plant Expansion Project specifically focuses on expanding the existing water treatment plant from 50 million gallons of water per day to 400 million gallons of water per day. Victaulic has partnered with the Houston Waterworks Team (HWT) (a JV of Jacobs and CDM Smith) to provide reliable infrastructure piping solutions. Victaulic Dynamic Movement Joints were utilized to accommodate for the expected amount of differential settlement present on site. Additional Victaulic solutions, Style W77 Flexible Couplings, and Victaulic Bolted Split Sleeve Couplings were utilized in other areas of the site to accommodate for dynamic movement.