Gold 1 – Cooke Plant Optimization Project

Wastewater Icon

INFORMACIÓN GENERAL DEL PROYECTO

TIPO DE PROYECTO:
Transport Line
Propietario:

Gold1

Ingeniería:

Gold1

Contratista:

Mocke Pipeline Construction

Material de tuberías:

Acero al carbón

Tamaños de tuberías:

16 – 18"

Ubicación:

Randfonein, South Africa

Soluciones:

  • Facilidad y rapidez de instalación
  • Flexibilidad
  • Advanced Grooved System (AGS)
  • Seguridad

When looking for a solution to join an 8km long 400-450mm (16’’ – 18″) pipeline used to transport water from a dam to the Fraser Alexander mine dumps, Gold 1 International Limited relied on Victaulic solutions.

To begin reclaiming the mine dump, Fraser Alexander needed to get the 8km pipeline installed. For this reason, Gold 1 wanted the pipeline installed quickly, with enhanced system reliability. They chose to partner with Victaulic on this critical application.

Victaulic provided system solutions for the pipeline including Style W77 AGS Flexible and Style W07 AGS Rigid Couplings. The contactor, Mocke Pipeline Constructions, was able to install 25 to 30 pipe spools a day, enhancing productivity on-site when compared to previously employed flanged joining methods. Victaulic Style W77 flexible couplings were installed to adhere to the challenging terrain, with custom-designed cups that encase the coupling’s bolts and nuts to prevent theft.

The use of Victaulic AGS solutions enabled Gold 1 to enhance onsite productivity and mitigate risk, completing the project on time and on budget.

DE UN VISTAZO

TIPO DE PROYECTO:
Transport Line
Wastewater Icon
Propietario:

Gold1

Ingeniería:

Gold1

Material de tuberías:

Acero al carbón

Ubicación:

Randfonein, South Africa

Contratista:

Mocke Pipeline Construction

Tamaños de tuberías:

16 – 18"

Soluciones:

  • Facilidad y rapidez de instalación
  • Flexibilidad
  • Advanced Grooved System (AGS)
  • Seguridad

When looking for a solution to join an 8km long 400-450mm (16’’ – 18″) pipeline used to transport water from a dam to the Fraser Alexander mine dumps, Gold 1 International Limited relied on Victaulic solutions.

To begin reclaiming the mine dump, Fraser Alexander needed to get the 8km pipeline installed. For this reason, Gold 1 wanted the pipeline installed quickly, with enhanced system reliability. They chose to partner with Victaulic on this critical application.

Victaulic provided system solutions for the pipeline including Style W77 AGS Flexible and Style W07 AGS Rigid Couplings. The contactor, Mocke Pipeline Constructions, was able to install 25 to 30 pipe spools a day, enhancing productivity on-site when compared to previously employed flanged joining methods. Victaulic Style W77 flexible couplings were installed to adhere to the challenging terrain, with custom-designed cups that encase the coupling’s bolts and nuts to prevent theft.

The use of Victaulic AGS solutions enabled Gold 1 to enhance onsite productivity and mitigate risk, completing the project on time and on budget.