The Top Six Mechanical Retrofitting Best Practices – Tip Three

abandoned building, empty room with window

The Top Six Mechanical Retrofitting Best Practices – Tip Three

Posted on April 09, 2019

When refurbishing old buildings, it is common to be faced with unforeseen events, such as the discovery of asbestos in the buildings’ structure, causing massive project delays, missing the project deadline and adding additional costs. Historic preservation also needs to be taken into account during construction works.

 

Tip Three: Take Unforeseen Circumstances and Historic Preservation & Sustainability into Account 

When installing a new HVAC system into an old building, existing decoration, furniture, paintings and wallpaper need to be considered since these can be highly damaged by fumes released when welding. A mechanical retrofitting best practice is to utilize a grooved mechanical pipe joining system which eliminates these risks, as well as the possibility of damaging the interior when bringing in welding equipment and the extra costs for fire blankets to protect the interior.

Another factor that has a huge influence on the preservation of a building is humidity. For example, wooden or painted surfaces can crack when the humidity in the winter isn’t high enough, or when humidity is too high, moisture can migrate through the walls.

It is crucial to keep the downtime as short as possible to reduce the risk of humidity settling in. Therefore, it is important to select a pipe joining method that creates multiple benefits when retrofitting, especially in the chance of an unforeseen event happening. A grooved mechanical pipe joining system allows for easy installation and maintenance and sustainability, keeping the system downtime as short as possible and can help to recover lost time and cut unexpected costs.

 

View the complete Mechanical Retrofitting Best Practices series here:

  1. Effective project design and preparation are essential
  2. Select the correct mechanical pipe joining method
  3. Take unforeseen circumstances and historic preservation & sustainability into account
  4. Maximize jobsite productivity
  5. Implement modular mechanical room to improve system efficiency
  6. Mechanical noise and vibration control methods
Victaulic

Victaulic

Victaulic is the leading producer of mechanical pipe joining solutions. Engineered with confidence, our solutions put people to work faster, while increasing safety, ensuring reliability and maximizing efficiency.

Related posts

Contractor retrofitting pipe - feature image for blog post from Victaulic with mechanical retrofitting best practices

The Top Six Mechanical Retrofitting Best Practices – Tip One

In this six-part series, learn about the top mechanical retrofitting best practices to maximize job site productivity.

grooved coupling diagram

The Top Six Mechanical Retrofitting Best Practices – Tip Two

Interested in mechanical retrofitting best practices? Learn about the top six here here. Tip 2: Select the Correct Pipe Joining Method

Large Pipe Retrofitting Job - Victaulic Best Practices - Tip Four

The Top Six Mechanical Retrofitting Best Practices – Tip Four

Interested in mechanical retrofitting best practices? Learn about the top six here here. Tip 4: Maximize Jobsite Productivity.

Recent posts

Victaulic Named Top 10 BIM Company 2019

Construction Tech Review magazine recently recognized Victaulic as one of the top 10 BIM services companies of 2019.

Union Station VDC image – Victaulic 3D laser scan with 3D pipe modelingScan Camera Piping

Scan to BIM Expedites 100-Year-Old Retrofit Project

Learn how Victaulic’s scan to BIM process expedited construction on a 100-year-old train station.

414 Light Street in Baltimore, Maryland

BIM Software Expertise Helps Poole & Kent Finish Ahead of Schedule

Find out how Victaulic’s BIM software expertise (Virtual Design and Construction (VDC) team) helped Poole & Kent finish HVAC infrastructure install...