Scan to BIM Expedites 100-Year-Old Retrofit Project

Union Station VDC image – Victaulic 3D laser scan with 3D pipe modelingScan Camera Piping

Scan to BIM Expedites 100-Year-Old Retrofit Project

Updated on August 26, 2019
Posted on July 11, 2019

 

When Kruse Corporation needed to retrofit the basement of the 100-year-old Union Station with a full hydronic piping system, they called on Victaulic for their scan to BIM expertise. The Kansas-based mechanical contractor needed a unique solution for the train station’s tight spatial constraints and a demanding construction schedule, made worse by the Thanksgiving and Christmas holidays. With the help of Victaulic’s Virtual Design and Construction (VDC) team and cutting-edge BIM technology, Kruse saved upwards of 30% on labor costs and cut the build time in half.

 

“… it was a 100-year-old building, and it had a tight window in terms of the schedule,” said Noah Morford of Victaulic. “So it took a lot of thinking outside the box about how this job was going to come to fruition.”

 

Victaulic’s VDC team used a 3D laser scanner to create an exact model of the space, eliminating the risk that comes with measuring the room by hand and detecting potential obstacles before equipment and products even arrive on site. This visualization of the project enabled Kruse to see the bigger picture from the start, catching key errors that would have put them behind schedule.

 

Click here to read the full story, now featured in MCAA’s Smart Solutions Summer 2019 issue. The Mechanical Contractors Association of America (MCAA) features innovative resolutions to construction obstacles in their Smart Solutions seasonal series. Victaulic’s scan to BIM knowledge helped this project overcome its many complications, earning it a spot in the most recent issue.

Victaulic

Victaulic is the leading producer of mechanical pipe joining solutions. Engineered with confidence, our solutions put people to work faster, while increasing safety, ensuring reliability and maximizing efficiency.

Related posts

414 Light Street in Baltimore, Maryland

BIM Software Expertise Helps Poole & Kent Finish Ahead of Schedule

Find out how Victaulic’s BIM software expertise (Virtual Design and Construction (VDC) team) helped Poole & Kent finish HVAC infrastructure install...

Construction Workers - Shinn Tunnel

Piping Partnership Helps Seattle Contractor Finish Tunnel Project in Ten Weeks

By partnering with Milwaukee and Victaulic, Shinn Mechanical successfully installed, tested and completed a two-mile drain piping system in Seattle...

This HVAC installation at 525 West 52nd Street in New York City was on budget and ahead of schedule

Victaulic VDC Turns In NYC’s Latest Luxury Building On Budget & On Time

With the help of Victaulic's VDC team, Martin Associates successfully installed, tested and completed the HVAC system at 525 West 52nd Street in le...

Recent posts

Victaulic Wins Gold and Bronze 2019 CSE Product of the Year Awards

2019 CSE Product of the Year Winners include [Gold] FireLock™ IGS™ Style V9 Sprinkler Coupling and Grooved Sprinklers, and [Bronze] QuickVic™ SD In...

The Cold Storage Construction Demand

As the cold storage construction demand booms, discover a safe and practical fire protection solution for your refrigerated warehouses.

Victaulic QuickVic™ SD Receives ACHR News 2019 Dealer Design Award

Victaulic Wins Gold in The ACHR News 2019 Dealer Design Awards

The QuickVic™ SD Installation-Ready™ System was recognized for outstanding product design in The ACHR News 2019 Dealer Design Awards program.